McGee Electrical Services completed the ground-up electrical installation for two new specialized facility structures at the Wilson Creek Regional Wastewater Treatment Plant: a main vehicle and heavy equipment maintenance building, and a dedicated employee facility for the solid operations team.
Working with Mart, Inc. and the North Texas Municipal Water District, our team executed complex, high-capacity industrial power infrastructure within tight spatial constraints. The scope included laying nearly 1,000 feet of underground duct bank, setting massive 34,000 lb concrete vaults, and integrating a medium-voltage transformer system tied directly into the facility's 4,160V power source.
Job Features
- Ground-up electrical construction for a heavy equipment maintenance facility and operational breakroom building.
- Installed nearly 1,000 linear feet of heavy-duty underground electrical duct bank.
- Rigged and placed multiple 8'x8'x9' precast concrete electrical vaults weighing approximately 34,000 lbs each.
- Medium-voltage step-down transformer installation integrated with customer-supplied 4,160V primary source.
- High-density layout of industrial power distribution, panelboards, and equipment connections in tight spaces.